|
|
ICT IN BIOLOGY TRANSECTS
AND CALCULATORS
A transect is a series of observations, or measurements, taken at regular intervals along a line.
Our aim is to use a transect to determine the change in a community as we progress from one habitat to another.
In this exercise an interrupted belt transect will be used.
MATERIALS
Tape or string marked in metre intervals, 1m2 quadrat, identification guide or species check list, hygrometer, soil thermometer, light metre, 2 ranging poles marked in 10cm intervals, spirit level, 20cm ruler,
TI-83 Plus calculator, CBL2 unit and probes.
METHOD
| 1. |
Lay out the tape or string across the transition zone so that it is straight and taught. Tie it down at both ends. Be careful not to trample the vegetation beside the line.
Note the orientation of the line (north-south, east-west etc.) and the major features along the transect. Use
a data table to record your results. |
| 2. |
Starting at one end, lay your quadrat by the side of the line and identify the species of plant or animal present. Estimate their abundance using the scale given
below: |
| |
Scale |
Percentage Cover |
Abundance Rating |
Trace |
<1% |
Single individual |
1 |
1 - 5% |
Rare |
2 |
6 - 25% |
Occasional |
3 |
26 - 50% |
Frequent |
4 |
51 - 75% |
Abundant |
5 |
76 - 100% |
Dominant |
|
| |
Record each species and their abundance in the table. Repeat this every other metre along the transect (see diagram
below). Add new species to the bottom of the list. |
 |
| 3. |
Record at the bottom of your table the abiotic factors measured every other metre along the transect: Measure these within are relative short space of time so that variations in the weather do not influence the readings too much.
You may collect your
data using your
calculator, the CBL2
interface and
probes. The data
will be stored in
the calculator which
can be downloaded
later (see relevant
instruction sheets). |
| 4. |
Record the height profile of the transect using the ranging poles and the spirit level. Place the first pole at the beginning of the transect and the second pole at 1 metre. Using the spirit level, measure the difference in height of the two poles. See the diagram
below. |
 |
| |
Record an increase as a positive value and a decrease as a negative value. Where there is a sudden change in height place the poles at shorter intervals. On soft ground be sure not to push the poles into the soil, they should be gently resting on the ground. |
|
|
>
ICT in Biology
ICT in Biology Index
This Site was last
updated on
29/10/07
© The Open Door Team
Any questions or problems regarding this site should be addressed to
the webmaster |
© Paul Billiet 2007 |